We finished our master bathroom a few months ago,
I finally am getting around to posting about it!
I'm really happy with how it turned out!
We're in the process of replacing the windows,
so I don't have the window covering made for it yet.
Another post for another day!
Since I'm not sure if I have the before pictures (because of the hard drive crash), I'll list the changes.
What we replaced/remodeled:
1. Tiled the floor (the same tile as the other bathroom)
2. Refinished the cabinets and counter tops
3. Replaced the mirrors and added trim around the mirrors
4. Painted the walls
5. Replaced baseboards
6. Tiled the shower; replaced the door, shower base, and fixtures
7. Replaced sink and other bathroom fixtures
8. Replaced medicine cabinet
9. Replaced light fixtures
10. Replaced the toilet
11. Fixed the pocket door and replaced the hardware on it
So glad it's finished!


No comments:
Post a Comment